Server:Apache...
The main IP address: 46.17.162.74,Your server United Kingdom,Cambridge ISP:Bridge Fibre Limited TLD:uk CountryCode:GB
The description :site map | members home the project partners contact us members menu notices project files my account sign out -- lightweight structural health monitoring system is a collaborative project developing...
This report updates in 12-Jun-2018
Created Date: | 2009-11-13 |
Changed Date: | 2017-01-24 |
Geo IP provides you such as latitude, longitude and ISP (Internet Service Provider) etc. informations. Our GeoIP service found where is host shemsproject.co.uk. Currently, hosted in United Kingdom and its service provider is Bridge Fibre Limited .
Latitude: | 51.733329772949 |
Longitude: | -2.3666698932648 |
Country: | United Kingdom (GB) |
City: | Cambridge |
Region: | England |
ISP: | Bridge Fibre Limited |
HTTP Header information is a part of HTTP protocol that a user's browser sends to called Apache containing the details of what the browser wants and will accept back from the web server.
Content-Length: | 13496 |
Set-Cookie: | JSESSIONID=abcW3PzmmEUbsct93I0pw; path=/; HttpOnly |
Keep-Alive: | timeout=15, max=100 |
Server: | Apache |
Connection: | Keep-Alive |
Cache-Control: | private |
Date: | Tue, 12 Jun 2018 15:09:33 GMT |
Content-Type: | text/html; charset=ISO-8859-1 |
soa: | ns0.twihosting.com. hostmaster.twihosting.com. 1 900 600 86400 3600 |
ns: | ns1.twihosting.com. ns0.twihosting.com. |
ipv4: | IP:46.17.162.74 ASN:51055 OWNER:BRIDGEP-AS, GB Country:GB |
mx: | MX preference = 10, mail exchanger = eu-smtp-inbound-1.mimecast.com. MX preference = 20, mail exchanger = eu-smtp-inbound-2.mimecast.com. |
site map | members home the project partners contact us members menu notices project files my account sign out -- lightweight structural health monitoring system is a collaborative project developing a lightweight structural health monitoring system for aircraft. through the development and application of energy harvesting, acoustic emission, and acousto-ultrasonic techniques we intend to develop a product suitable for deployment onto critical aircraft components and be able to determine their structural integrity. the system will comprise of a network of independent but collaborative acoustic devices, each operating under its own power through energy harvesting and communicating wirelessly. reliability and safety are critical to the aerospace industry. the project is an opportunity to make a major leap forward in these areas, by offering continuous inspection coverage for aircraft both on the ground and in flight. existing non-destructive testing (ndt) techniques, while effective, rely on taking an aircraft out of service. this downtime is a) very expensive, and b) means that there are large time periods between inspections. the continuous coverage offered by the system will be able to identify delamination, fibre breakage, corrosion, fatigue, and impact damage faults at an earlier stage; in doing so, it will reduce the length of downtime, and facilitating safer and more effective maintenance schedules. further routes of exploitation include the aircraft development sector and military applications. when applied to aircraft in the development stage it will provide both the design engineers and pilots with component safety information. similarly, up to the minute information about the structural integrity of their aircraft will be a valuable asset to military operators; pilots can have confidence in their planes and the engineers on the ground have the benefit of knowing where potential problems are ahead of time. the project partnership pulls together expertise from highly respected research organisations and industrial experts, as well as globally operating aerospace companies. see the partners link, for more information on the members of the project consortium. this project is partially funded by the british technology strategy board. the technology strategy board (tsb) is an executive non-departmental public body established by the government in 2007 and sponsored by the department for business, innovation and skills. the activities of the tsb are jointly supported and funded by bis and other government departments, the devolved administrations, regional development agencies and research councils. more information about the tsb is available at http://www.innovateuk.org/aboutus.ashx username : password :
http://www.shemsproject.co.uk/../site_map/index.jsp
http://www.shemsproject.co.uk/../notices/index.jsp
http://www.shemsproject.co.uk/../partners/twi.jsp
http://www.shemsproject.co.uk/../home/index.jsp
http://www.shemsproject.co.uk/../project/objectives.jsp
http://www.shemsproject.co.uk/../contact/index.jsp
Whois is a protocol that is access to registering information. You can reach when the website was registered, when it will be expire, what is contact details of the site with the following informations. In a nutshell, it includes these informations;
Domain name:
shemsproject.co.uk
Registrant:
TWI Ltd
Registrant type:
UK Limited Company, (Company number: 3859442)
Registrant's address:
Granta Park
Great Abington
Cambridge
Cambridgeshire
CB21 6AL
United Kingdom
Data validation:
Nominet was able to match the registrant's name and address against a 3rd party data source on 10-Dec-2012
Registrar:
TWI Ltd [Tag = TWI]
URL: http://www.twi.co.uk
Relevant dates:
Registered on: 13-Nov-2009
Expiry date: 13-Nov-2019
Last updated: 24-Jan-2017
Registration status:
Registered until expiry date.
Name servers:
ns0.twihosting.com
ns1.twihosting.com
WHOIS lookup made at 23:12:28 18-Aug-2017
--
This WHOIS information is provided for free by Nominet UK the central registry
for .uk domain names. This information and the .uk WHOIS are:
Copyright Nominet UK 1996 - 2017.
You may not access the .uk WHOIS or use any data from it except as permitted
by the terms of use available in full at http://www.nominet.uk/whoisterms,
which includes restrictions on: (A) use of the data for advertising, or its
repackaging, recompilation, redistribution or reuse (B) obscuring, removing
or hiding any or all of this notice and (C) exceeding query rate or volume
limits. The data is provided on an 'as-is' basis and may lag behind the
register. Access may be withdrawn or restricted at any time.
REFERRER http://www.nominet.org.uk
REGISTRAR Nominet UK
SERVERS
SERVER co.uk.whois-servers.net
ARGS shemsproject.co.uk
PORT 43
TYPE domain
OWNER
ORGANIZATION TWI Ltd
TYPE
UK Limited Company, (Company number: 3859442)
ADDRESS
Granta Park
Great Abington
Cambridge
Cambridgeshire
CB21 6AL
United Kingdom
Data validation:
Nominet was able to match the registrant's name and address against a 3rd party data source on 10-Dec-2012
DOMAIN
SPONSOR TWI Ltd [Tag = TWI]
CREATED 2009-11-13
CHANGED 2017-01-24
STATUS
Registered until expiry date.
NSERVER
NS0.TWIHOSTING.COM 46.17.162.88
NS1.TWIHOSTING.COM 46.17.162.90
NAME shemsproject.co.uk
DISCLAIMER
This WHOIS information is provided for free by Nominet UK the central registry
for .uk domain names. This information and the .uk WHOIS are:
Copyright Nominet UK 1996 - 2017.
You may not access the .uk WHOIS or use any data from it except as permitted
by the terms of use available in full at http://www.nominet.uk/whoisterms,
which includes restrictions on: (A) use of the data for advertising, or its
repackaging, recompilation, redistribution or reuse (B) obscuring, removing
or hiding any or all of this notice and (C) exceeding query rate or volume
limits. The data is provided on an 'as-is' basis and may lag behind the
register. Access may be withdrawn or restricted at any time.
REGISTERED yes
The following list shows you to spelling mistakes possible of the internet users for the website searched .